Home > D-SIMCON > Sub Fab Material Planning

Sub Fab Material Planning

A per-product and per-tool granularity WIP flow forecast in the fab can also enable much more pro-active material planning in the sub-fab. For example, anticipated dates for the replacement of photo resist bottles at coating tools can be determined with high accuracy. As a result, throughput losses because of non-availability of material can be avoided.

…enabled by D-SIMCON Forecaster